Project Description
15.000m² Marquardt New Macedonia Plant has production, administration and canteen buildings.
Our turnkey scope covers 9 ea. 20kV MV cubicles, 20kV/0,4kV 2 ea. 1.250 kVA cast resin type transformer, 1 ea. 1400 kVA diesel generator, 2 ea 30kVA UPS, 40 ea. LV panelboards, 6.500mts cable trays, 20.000mts conduit, 750mts Busbar, 200mts MV Cable, 70.000mts power and 50.000mts of low current cables, 3.000 ea. lighting and socket points, 20.000 ea. lighting fixtures, 1.000 ea switch-sockets, fire alarm system with 1.525 points, 70 CCTV cameras, card access system with 120 points, intercom
system with 10 points, Clock System with 14 points, Central Battery sytem with 450 points, RWA System with 120 points.
Turnkey mechanical scope covers 2 pieces of air cooled chiller with a capacity of 550 kW and 350 kW, 500 kW cooling tower and stainless steel piping for process cooling, 700 kW hot water boiler and 60.000 lt. underground LPG system, 2 pieces 80.000 m3/h air handling unit and ducting for ventilation and air conditioning of factory building, 1 piece 23.000 m3/h air handling unit for Office building air conditioning, 74.000 m of concrete core tempering piping for heating and cooling system, compressed air plant with 2 air compresser with a capacity of 25 m3/min @ 11 bar,VRF heating and cooling system for Office building, Automatic fire sprinkler system consist of 600 m3/h and 150 m3/h capacity 4 pieces of fire pumps and ancillaries, syphonic system rain water drainage system. building automation system controlling all HVAC and process cooling system.