Project Description
The U.S. New Embeassy Compound Skopje , all electrical works turn-key installation. All installation follow American NEC, using material with complying standarts. Complete site consisting of a 3-floor main consulate building (NOB), 2-floor MSGQ, and 2-floor GSO, and auxiliary buildings. Covered area of approximately 18,000 m2 and open area of 60,000 m2.
Complete installation of above-ground
Technical/Electrical Systems:
• Main feeders installation
• MV Transformer, Generator Installation
• Lightning and small power
• Telecom/Data and TV system
• Fire alarm system
• Technical Security Systems
• Street and facade lighting
• Building Automation System
• 45.000 mt EMT conduit
• 1.000 mt Rigid Galvanized conduit
• 172.000 mt THHN cable
• 25.000 mt XLPE/XHHN Feeder Cable
• 1.500 mt MV Cable
• 55.000 mt TSS CABLE
• 800 mt TV cable
• 45.000 mt Data cable
• 12.000 mt Fiber cable