Project Description
The realization of power and automation systems in raw material cooling & stocking at Kurtalan Cement Complex owned by Limak Holding. In this scope, Medium Voltage cabling, replacing of old MCC, PLC and LV panels with the new ones, busbar system, cable raceway and 185 control point automation system including control cabling and instrumentation were done, commissioned and taken into operation successfully.
Project Details
Customer
Tempa
Work Location
TURKEY
Date
15 / 3 / 2002
End Date
30 / 6 / 2002