Project Description
The project covers installation, start up and commissioning of mechanical and electrical works of 24.000 m² of Kromberg & Schubert Cable Harness Manufacturing Plant. The main works items can be listed as follows:
Chilled water system
Heating water system
Air conditioning system
Sprinkler system
Plumbing system
Compressed air system
Syphonic rain water system
Earthing and Lightning Protection
LV Distribution
Interior and Exterior Lighting
Small Power Distribution
UPS
Weak Current Systems such as Fire Alarm, CCTV and IT Systems
Project Details
Customer
Pera Construction
Work Location
NORTH MACEDONIA
Date
1 / 7 / 2012
End Date
1 / 3 / 2013
Covered Area Size
24.000 m²