Project Description
The job in new US Consulate Building in İstanbul covers the shop drawings & logistics services and turn-key installation of all the electrical works. The design and specification is based on US standarts and most of the material used are US origin. The BoQ includes 50 km EMT conduit, 200 km power wiring, 2.000 ea lighting fixtures, 1.100 ea duplex NEMA6 receptacles, data system with 750 points and 12 SM fibre optic incoming unit and all the sub structure works and external lighting in an area of 160.000 mt sq.
Employer : Caddell
Location : Yaounde / Cameroon
Date of Start : 01 / 01 / 2004
Completion Date : 31 / 09 / 2005
Construction Area : 13.500 m2
The scope of supply of the U.S.A. Embassy in Cameroon, built by the OBO department of the U.S.A. State Ministry consists of electrical installation works based on turn-key delivery of preparation of the execution drawings and material BOQ, acceptance procedures, installation, commissioning, client acceptance tests. This project has been executed with total compliance to the American standards and with compliant material. In this project, 90 km galvanized electrical steel pipe, 300 km single wire cable with various section, 2200 pieces of lighting fixture, 1750 pieces power outlets, 12 SM fibre optic input with 900 points telecom system, fire alarm system, anouncement and security system, outdoor and indoor lighting installation have been realized.
Employer : Caddell Inc.
Location : Bamoka / Mali
Date of Start : 01 / 01 / 2004
Completion Date : 31 / 09 / 2005
Construction Area : 13.500 m2
The scope of supply of the U.S.A. Embassy in Mali, built by the OBO department of the U.S.A. State Ministry consists of electrical installation works based on turn-key delivery of preparation of the execution drawings and material BOQ, acceptance procedures, installation, commissioning, client acceptance tests. This project has been executed with total compliance to the american standards and with compliant material. In this project, 90 km galvanized electrical steel pipe, 300 km single wire power cable with various section, 2200 pieces of lighting fixture, 1750 pieces power outlets, 12 SM fibreoptic input with 900 points telecom system, fire alarm system, announcement and security system, outdoor and indoor lighting installation have been realized.