Project Description
Being a tenant in İs Towers, Tower 2 at floors 21 to 26, Anadolu Sigorta had chosen Novatek for the realization of all the power, lighting, sound and security system infrastructure of her premises.Within this Project we have realized supply and installation of 10.000 mts of EMT conduits, 50.000 mts of halogen free low current cabling and 10 LV panelboards and installation only of all the electrical field equipment supplied by the client. The complete system have been tested and put in operation successfully within a very short period of time.
Project Details
Customer
Anadolu Sigorta
Work Location
TURKEY
Date
1 / 12 / 2000
End Date
30 / 4 / 2001
Covered Area Size
3.600 m2