Project Description
The largest shopping mall & amusement complex at Kursky region of Moscow city. Our scope of work covered supply and installation of all motor control centres, building automation system panels, supply and installation of cable raceways and cables including the electrical design of all technical premises. 26 power, 26 automation, 46 motor control panels’ design, approval and supervision to manufacturing were in our engineering scope whilst 2500 meters of cable tray installation, 30.540 meters of power and 39.000 meters of low voltage cabelling, 82 units of safety switch installation, 19 units ıf frequency of converter installation were successfully done by experienced Novatek work force. 91 units of air handling units, 30 units of smoke extraction fans, 5 units of chillers, 4 units of cooling towers, 33 various pumping units were taken into service, tested, comissioned and handed over to client’s O&M team within the contracted time limits.