Project Description
Scope of work covers:
1. Design, approval & energy permits, material supply and installation of a new 36/36 kV MV distribution substation with 4 units of MV panels.
2. Design, approval & energy permits, material supply and installation of a 36/0,4 kV substation with 2x1600 kVa transformers & 4 units of MV panels for a new knitting complex.
3. Design, approval & energy permits, material supply and installation of a 36/0,4 kV substation with 2x1600 kVA transformers & 4 units of MV panels for a new dyeing complex.
4. Design, approval, supply and installation of 20 various 0.4 kV power and lighting panels.
5. Interior & exterior lighting of the new 2 complexes with 6000 lighting fixtures and 25.000 meters of LV cabling.
6. Grounding of the whole complex.
In the scope of supply of electrical works of the ISKO Textile Factory, cogeneration plant, 9 pieces of MV cubicles revision, 10 pieces of new MV cubicles installation, 1 piece of 34,5 / 0,4 kVA 1600 kVA dry type power transformer installation, 2 pieces of LV panel, 3600 mt of MV cable, 400 mt of power cable, 6000 kg of cable tray, 60 pieces of lighting fixture installation works are realized.