Project Description
The job is the electrical works of the Congress & Culture Center building with 146.000 m2 site area and 95.000 m2 construction area, at the coast of Golden Horn in Istanbul.
The capacity of seats are Exhibition halls: 955 seats, Theatre Hall: 1138 seats, Concert Hall: 3008 seats, Cinema Hall:761 seats, Restaurants total capacity: 335 persons, Foyer total capacity:3100 persons, Carpark: 700 cars.
MV-system including 3 ea 34.5 kV cubicles; 20 ea 10 kV cubicles; 1 ea 7 MVA, 34.5 kV/10 kV transformer; 1 ea 2 MVA, 10kV/0,4 kV transformer; 4 ea 1600 kVA, 10kV/0,4 kV transformers; 1 ea 1000 kVA, 10 kV/0,4 kV transformer; 2 ea 1600 kVA, 10kV generator sets (synchron with network); 5 km power cable, SCADA energy monitoring system have been delivered, installed and handed over.
LV-system including 5 ea main distribution panels, 285 ea auxilary panels, 8872 ea various lighting fixtures, 3200 ea switches & sockets, 42000 kg cable trays, 648 km power cables have been delivered, installed and handed over.
Electronic systems including 3250 ea addressable fire alarm devices, 1100 ea announcement and music system devices, 198 ea CCTV cameras, 125 ea card access system readers, 130 ea sockets for satellite TV system, 1150 ea data & telephone system passive/active devices, 3750 points lighting automation system, 410 km cable have been delivered, installed and handed over.