Project Description
Preparing design and shop drawings for all the electrical power and weak current systems of new International Terminal 3, comprised of A-B-C blocks and power plant. (As Berksan and Novatek JV.) The following systems are in the scope of Works.
Medium Voltage System,
Main Power Distribution,
Lighting System,
Small power System,
UPS System,
Grounding and Lightning Protection System,
Fire Alarm System,
Access Control System,
Water Leak Detection System,
Master Clock System,
Structured Cable Network System,
Public Address System,
Closed Circuit TV System (CCTV),
Master Antenna TV System (MATV),
Disabled System,
Equipment Room System,
Audio Visual System,
Air Field Lighting System.
Project Details
Customer
LIMAK CONSTRUCTION
Work Location
Cairo / Egypt
Date
1 / 11 / 2012
End Date
28 / 6 / 2014
Covered Area Size
200.000 m²