Project Description
53.000m² Greenist Residence has 174 furnished flats and health club. 27.000m² Hilton Garden Inn İstanbul Airport Otel has 219 rooms, Ball-Room and Meeting rooms.
Our turnkey scope covers supply and installation of 13 ea. MV cubicles, 34,5kV/0,4kV 1 ea. 1.600 kVA cast resin type transformer, 2 ea. 1.250 kVA cast resin type transformer, 2 ea. 630 kVA diesel generator, 2 ea. 825 kVA diesel generator, 655 ea. LV panelboards, 3 ea. 30kVA UPS, 2 ea. 20kVA UPS, 25.495mts cable trays, 41.822mts conduit,1.000mts Busbar, 1.340mts MV Cable, 111.476mts power and 291.861mts of low current cables, 30.220 ea. lighting and socket points, 20.217 ea. lighting fixtures, 27.891 ea switch-sockets, fire alarm system with 4.621 points, 1.290 speakers, 377 cameras, card access system with 229 points, intercom system with 297 points and grounding-lightning protection system.